| Selection Steps | Core Operations/Branch Conditions | Key Focus/Specific Requirements | Applicable Scenarios/Examples |
| Step 1: Confirm Calcination Material Type | Ore type (bauxite, limonite, etc.) | Material adaptability, uniform heating, sealing design | Mining industry, ore calcination, magnetization roasting |
| Cement clinker | Thermal efficiency, load-bearing capacity, continuous operation stability | Cement production industry, large-scale clinker calcination |
| Lime/carbon materials | Energy-saving burner, sealed feeding/discharging system | Lime production, calcination of carbon materials such as activated carbon/graphite |
| Step 2: Determine Project Capacity Scale | Match kiln specifications according to annual output | Corresponding kiln diameter and length according to capacity | 50,000 tons/year → Φ2.5×40m; 200,000 tons/year → Φ3.2×50m; 1,000,000 tons/year → Φ4.8×72m |
| Reserve capacity expansion space | Reserve 10-20% capacity to avoid subsequent equipment replacement | Small and medium-sized projects planning to expand production in 3-5 years |
| Step 3: Select Suitable Fuel Type | Sufficient natural gas/LPG | Clean and efficient, thermal efficiency up to 85% | Areas with abundant gas resources and high environmental protection requirements |
| Insufficient gas supply, remote areas | Stable combustion, easy storage and transportation | Remote mining areas, temporary calcination projects |
| Strict environmental protection, high-purity materials | Pollution-free, precise temperature control | Calcination of high-purity alumina, special ceramics and other materials |
| Sufficient coal, large-scale projects | Low fuel cost, need to be equipped with flue gas treatment system | Large cement plants, bulk ore calcination projects |
| Step 4: Confirm Environmental Protection and After-Sales Requirements | Environmental protection configuration | Pulse bag filter (dust removal rate ≥99.9%) + flue gas treatment system | All projects that need to meet global environmental emission standards |
| After-sales support | On-site installation and commissioning, operator training, 24-hour global after-sales service | All-scale calcination projects to ensure long-term stable operation of equipment |
| Final Step | Match Chunlei customized solution | One-on-one adaptation by engineers to determine the model | All scenarios, free quotation available |